| |
Past Projects
|
| |
Advanced Airfield Fire Fighting Station 304 Washington Dulles Intl. Airport
| Firms |
Corinthian Contractors, Inc. (Prime) |
| Project Name |
Advanced Airfield Fire Fighting Station 304 Washington Dulles Intl. Airport |
| Contract No |
1-07-C116 |
| Location |
Sterling, Virginia |
| Owner/Client |
Metropolitan Washington Airport Authority
One Aviation Circle, Washington, DC 20001 |
| POC |
Janice Balzarini (703) 417-8631 |
| Status of Project Percentage |
100% |
| Original Contract Cos |
$9,714,000.00 |
| Completion Date |
November 2008 |
| Construction Type |
Total Site Development and Paving for New Base Building |
| Contract Type |
Firm-Fixed |
| Special Features |
- Apparatus Bay Paving for Emergency Vehicles,
- Concrete Paved Approach Slabs to Facility. 2400 LF 16’ 12’ 10’ Waterline (150’ Jack & Bore)
- 3800 LF of Ductile Iron Force Main and VALVES, Pump Station, Blowoffs, Check Valves
- Coordination of VALVE OPERATIONS for Shutdowns
- 700 FT of 8” inch gravity sewer approximately 18ft to invert
- 4’ Manholes 8’-24’ Depth |
|
 |
 |
|
|
| |
|