Loading Flash Menu
 
Past Projects
 
Advanced Airfield Fire Fighting Station 304
Washington Dulles Intl. Airport

Firms Corinthian Contractors, Inc. (Prime)
Project Name Advanced Airfield Fire Fighting Station 304
Washington Dulles Intl. Airport
Contract No 1-07-C116
Location Sterling, Virginia
Owner/Client Metropolitan Washington Airport Authority
One Aviation Circle, Washington, DC 20001
POC Janice Balzarini (703) 417-8631
Status of Project Percentage 100%
Original Contract Cos $9,714,000.00
Completion Date November 2008
Construction Type Total Site Development and Paving for New Base Building
Contract Type Firm-Fixed
Special Features - Apparatus Bay Paving for Emergency Vehicles,
- Concrete Paved Approach Slabs to Facility. 2400 LF 16’ 12’ 10’ Waterline (150’ Jack & Bore)
- 3800 LF of Ductile Iron Force Main and VALVES, Pump Station, Blowoffs, Check Valves
- Coordination of VALVE OPERATIONS for Shutdowns
- 700 FT of 8” inch gravity sewer approximately 18ft to invert
- 4’ Manholes 8’-24’ Depth

 
Home  |  Company Info  |   Staff Info   |   Current Projects  |   Past Projects  |  Contact Us
Phone: (703) 998-6510   Fax: (703) 998-6512   E-mail: Info@corinthiancontractors.com
Copyright © 2010 Corinthian Contractors, Inc. All Rights Reserved.